Objective
To control quality during the actual work — casting, masonry, plastering, etc.
Modules
Pre-Execution Checks
Drawing verification
Site condition & level checking
Pre-pour checklist
Concrete Works
Batching, mixing, slump test, cube casting
Concrete pour card and curing monitoring
Record keeping
Masonry & Plaster
Mortar proportion checking
Alignment, joints, curing control
Waterproofing & Finishes
Surface preparation
Layer-wise inspection
Testing: pond test, adhesion test
Inspection & Test Plans (ITP)
How to prepare an ITP for each activity
Linking ITP with checklist
Non-Conformance & Corrective Action
NCR format and root cause analysis
How to handle rework professionally
Introduction to QMS and Lead Auditor
ISO 9001:2015
1st Party Audit
2nd Party Audit
3rd Party Audit
Deliverables:
a. Daily QA/QC site checklist
b. ITP template
c. Non-conformance Report format
Objective
To verify and document completed work as per specifications before handover.
Modules:
Activity-wise Final Inspection
Structural, Architectural, Electrical, Plumbing
Finishing checklist
Dimensional & Visual Checks
Alignment, levels, plumb, finish
Test Reports Compilation
Cube results, material tests, waterproofing test results
File organization for client submission
Snag List & Rectification
How to prepare a snag/punch list
Closing snag reports
Deliverables:
a. Final inspection checklist
b. Snag list format
c. Work completion report template
Objective
To ensure the site is defect-free, safe, and ready for handover.
Modules:
Pre-handover Inspection
Joint inspection with client/consultant
Defect rectification process
Document Control for Handover
As-built drawings
Test certificates
Calibration records
Material approval folder
Handover Package Preparation
QA/QC dossier
Work completion certificates
Final sign-off formats
Post-Handover Maintenance Check
Quality follow-up system
Warranty/guarantee documents
Deliverables:
Handover checklist
QA/QC dossier index
Sample handover letter
Bonus Module:
Digital QA/QC Tools
Excel-based QC tracking
Google Drive folder setup
Photo documentation standards
Using mobile apps for QC (Excel, AutoCAD drawing review)
Outcome:
After completion, the trainee will be able to:
Manage QA/QC documentation independently
Conduct site inspections confidently
Handle consultants and clients professionally
Maintain ISO 9001:2015 quality standards